Before the every other day snow started, Tim, Kevin and Mike were up north on a commercial project in Moultonborough. They were tasked with excavating and installing 260′ of schedule 80 conduit from an electrical pullbox to the customer’s existing house meter. Although it had it’s challenges with all of the rocks and boulders that needed to find new homes, the guys did a real good job getting it done! They’ll be back after mud season for restoration.
Pre-Dig Inspection, Gilford NH
Here at LJM, we conduct pre-dig inspections to make sure that everything we wanted marked by the utility locators has been successfully completed. When I showed up to this job site, there was a crew getting ready to pave a driveway in our dig path!...