Went up to Laconia today to visit Larry, Troy and Wyatt on their current job site. They are installing approximately 320′ of 3″ conduit from an existing transformer to a new above ground handhole that they will install. They have some obstacles in the way like concrete stairs and sidewalks and they are going to attempt to pneumatic bore under a driveway. They’ll then install another above ground handhole and then tie into a meter on a customer’s home. So far so good!
Septic System, Hillsborough NH
Failed septic system, removal of tank, leach field, and installation of new tank and leach field I dropped by to check on Brandon and his crew to see how this failed septic system job was going. We had their old tank pumped out and Brandon's crew...