Transformer Pad with Curbing Installation

Keene, NH

The work request was to supply and install two rows of 5″ and four rows of 4″ sand encased schedule 40 conduit.

We also had to install a pre-cast concrete transformer pad and ground grid as well as create a new granite curbed island.

This job required one road crossing as well as restoration of the areas disturbed by excavation.