Larry’s crew and sometimes more than his usual gang excavated and installed 4,800 feet of 4″ schedule 80 conduit. They also had to install 6 single phase vault structures and cut approximately 8 road crossings. We’ll be back in the spring for loam and seed as the area is just machine grade finished at the moment
Great job to everyone involved! I’m fairly certain that every employee we have had their boots touch that project!!
Utility work in Greenland NH
The digging here can be challenging but every so often, nature reminds you why NH is called the "Granite State". Tim and his crew were over in Greenland smashing ledge so a utility pole can be installed. Great job guys!!!