Went up to Laconia today to visit Larry, Troy and Wyatt on their current job site. They are installing approximately 320′ of 3″ conduit from an existing transformer to a new above ground handhole that they will install. They have some obstacles in the way...
Water drainage, residential job in Bedford NH The customers’ driveways and front yard area would periodically flood and water would leech out of the ground during the winter and cause his and his neighbor’s driveways to flood and ice over. He stated that...
Failed septic system, removal of tank, leach field, and installation of new tank and leach field I dropped by to check on Brandon and his crew to see how this failed septic system job was going. We had their old tank pumped out and Brandon’s crew removed their...
Stopped by Tim’s crew in Grantham to see how things were going. They were on site to excavate and install about 100′ of 3″ conduit from an existing pole to the meter on the front of the residence. It was miserable out there but they did a great job...
Larry’s crew and sometimes more than his usual gang excavated and installed 4,800 feet of 4″ schedule 80 conduit. They also had to install 6 single phase vault structures and cut approximately 8 road crossings. We’ll be back in the spring for loam...