Before the every other day snow started, Tim, Kevin and Mike were up north on a commercial project in Moultonborough. They were tasked with excavating and installing 260′ of schedule 80 conduit from an electrical pullbox to the customer’s existing house meter. Although it had it’s challenges with all of the rocks and boulders that needed to find new homes, the guys did a real good job getting it done! They’ll be back after mud season for restoration.
Utility work in Greenland NH
The digging here can be challenging but every so often, nature reminds you why NH is called the "Granite State". Tim and his crew were over in Greenland smashing ledge so a utility pole can be installed. Great job guys!!!